The hole punches came in Tuesday and the Dishwasher Air Gap was installed that night with ease. The new pot rack came in Friday and is installed and has the liquor and tea pots on it, I haven't hung many pans on it yet though.
All but 9 of the handles have been added to the cabinets. I still need to make the jig for those (I just realized that the jig I made should in fact work so I will do that tonight). All of the drawers and the doors that fit the jig I made have handles on them now. Pictures will be added when I get the rest of them on.
My dad and
Thanks to
I did go out for a bit yesterday to build a bookcase for the computer room, with plenty of water and trips back in the house to cool off of a bit. I also got a set of the LACK shelves hung. Those combined with the bookcase that doubles as a cat shelf by the window the room has a lot more floor space as several more boxes have been emptied. It also helps that I sent the old monitor home with my dad to replace the MAG that he was using.
Got up at about 6:30am or so Saturday morning and ventured up into the attic. I put on the adapters for the roof vents and attached the flexible ducting for the range hood, and half of the bathroom vent. I needed a 4" to 6" adapter and a short 4" extension, which I picked up later in the day, so I will have to make another trip into the attic soon. After I got the range ducting in, I installed some more sofit vent trays around the perimeter, then I moved all of the insulation batting back where it should be rather than all piled up on one side.
(updated by